24 Welcome to your Saudi Aramco Safety Officer Evaluation Online Exam let's get start Name Email 1. Forklifts shall not be left unattended with the engine running. When forklifts are parked the forks shall not be in a raised position. False True None 2. Personnel basket shall not be permitted to transfer personnel when the wind speed exceeds _______ or in rough weather 25 km/h (14 knots) 50 km/h (28 knots) 28 km/h (21 knots) 13 km/s (7 knots) None 3. When checking the ground on a duplex outlet, which of the following provides the best method? Check the continuity between green wire and the building ground Check the continuity between the block and the white wire Check the continuity between white wire and the outlet box Check the continuity between green wire and the outlet box None 4. Light duty scaffold designed and constructed to carry the: weight of personnel only Uniformly distributed maximum intended load is 120 kg/m2 (1.2 kN/m2) (25 lb/ft2). no material storage other than the weight of tools All of the above None 5. Flammable materials storage area cannot be located within_________ of other buildings or structure. 50 ft 50 Meters 25 ft 100 ft None 6. What is the permissible noise exposure for an eight hours work shift? 100 80 120 90 None 7. Spray Painting requires? No wind A correct air purifying respirator A good spray Work only in spray painting shop None 8. A person allowed to operate crane in S.A project, “Select all that apply:” SAG licensed personnel. Crane maintenance personnel and inspector in the performance of duties S.A. certified crane operator Trainees Under the direct supervision of qualified trainer None 9. Whenever there is any doubt as to safety of the lift, the crane operator shall: Refuse to handle unsafe loads Stop all hoisting activities. a and b only Discuss the matter with the signal man None 10. Minimum period of time the appointed “fire watch” remain at the site of HOT work after the activity has stopped 60 minutes 30 minutes 10 minutes 15 minutes None 11. Moving machine parts shall be ________ if located 2.5m(8.2ft) or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. Guarded Separated Removed Eliminated None 12. Forklifts shall be equipped with, “Select all that apply:” Overhead protection A backup warning alarm Seatbelts All of the above A fire extinguisher None 13. The maximum working pressure on an acetylene gauge is ________ psig. 7 10 20 15 None 14. During storage of oxygen and acetylene gas cylinders they must be separated by (1) A fire Resistant wall or (2) a Distance of______: Not required if tanks are empty None of the above 20 feet 50 feet None 15. When there is opening in roof work and/or edges of roof, and a fall hazard exist, barricades must be installed capable of withstand a force of: 100 lbs (54.4kg) 150 lbs (68kg) 200 lbs (91kg) 125 lbs (56.7kg) None 16. The maximum voltage permitted for portable power tool in construction site is: 220 Volt 110 Volt 240 Volt 150 Volt None 17. Work platforms must have toe boards, top rails and access ladders once they reach a height of_____: 4 ft When the height is four times greater than the base width 8 ft 6 ft None 18. which of the statement is correct, “Select all that apply:” A special scaffold is: Over 42 metres Cantilevered scaffold by more than 3 meters (10 feet) Formwork shoring constructed of scaffolding materials and supporting an elevated concrete slab/deck more than 100 mm (4 inches) thick Scaffold supported by or hung from wind girders or roof / floating roof tanks None 19. Which of the following factors does affect the load capacity of a mobile crane? Boom angle Installation of an anti-two block device Boom length Extending the out rigger fully None 20. The soil type that is least stable in an excavation is: Type B Type C None of the above Type A None 21. How many clips are required to construct an eye in a one half inch wire rope? 3 clips with U bolt on the dead end 4 clips with U bolts on the dead end 4 clips with U bolts on the live end 3 clips with U bolts on the live end None 22. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12” wide True False None 23. Personnel performing work at heights and their supervisors shall: All of the above Be trained in the nature of fall hazards in the work area and Undergo refresher training at least every 3 years Demonstrate competency by successfully passing written and practical tests. None 24. What is necessary for a worker to wear on a steel beam six feet of more above ground? None of the above A full body harness with lanyards attached to an anchor point A steel belt with steel or brass coupling He must never go on steel beam None 25. What is the first thing you should do if a person falls in the water? Throw a floatation device in the water Inform the Captain/Maser. Shout “Man Overboard” Follow the directions of the Captain/Master None 26. Who is allowed to perform abrasive blasting? All Saudi Aramco certified employees and Contractor All Saudi Aramco employees and Contractor with 3rd party certification All Saudi Aramco employees and Contractor Contractor abrasive blasters None 27. The ratio of vertical to horizontal spacing for a straight or extension ladder is: 2 to 1 4 to 1 3 to 1 1 to 1 None 28. What is the purpose of a hold tag? To work the job safely All of above To explain the reason why the equipment is being locked out To isolate or de-energized equipment None 29. When grinding a piece of metal with a portable power grinder, the type of Personal Protective Equipment required is: Safety glass only Safety glasses/face shield combination Face shield only Goggles only None 30. How long is a work permit usually valid 1 Shift 1 Day 1 Week 1 Month None 31. A crane is working near 2 meter deep excavation, minimum distance from the edge shall be: 3 Meter 1 Meter 2 Meter None of the above None 32. Contractor shall provide one (1) safety Supervisor for: Every 10 safety Officer Every area regardless the number of safety Officer Every 8 safety Officer Every 5 safety Officer None 33. Flammable materials storage areas cannot be located within________ of other buildings or Structures: 25 ft 100 ft 50 meters 50 ft None 34. If someone is injured on your job site, a preliminary written report must submitted to the Saudi Aramco PMT within _________ period of time: 8 Hours 3 Days 2 Hours 24 Hours None 35. If someone is injured on your job site, a preliminary written report must be submitted to the Saudi Aramco PMT within ________ period of time and final report within _________: 8 hours, 72 hours 2 hours, 48 hours 1 hour, 48 hours 24 hours, 72 hours None 36. A design of straps that may be secured about a person in a manner to distribute the fall arrest forces over the thighs, pelvis, waist, chest and shoulders, with means for attaching the harness to other components of a personal fall arrest system is called: full Body Harness Body Belt Positioning Device Layard None 37. How should you stand on a moving personnel basket? Lean forward, both feet on the basket rim, hold with both hands Stand straight, both feet on the basket rim, hold with both hands Stand straight, one foot on the basket rim, hold with both hands. Lean backward, both feet on the basket rim, hold with both hands. None 38. Forks shall be tilted back and raised no more than______ above the ground to maintain stability when traveling with loads. 15-30 cm (6-12 inches) 15-20 cm (6-8 inches) not required. 10-20 cm (4-8 inches) None 39. Where is a work permit required? All Saudi Aramco Areas None of the above Construction work shop In areas designated by the department manager as requiring a work permit None 40. Hold tags and locks are primary intended to protect the individual who is doing the work from? Sleeping Being injured in case of accident start up Leaving until the work is completed Being thrown in jail None 41. Moving machinery parts shall be guarded if located ________or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. 2.5 m (8.2 ft) 1.8 (6ft) 2m 1.5m None 42. Reverse alarms shall be minimum_____ audible and working on all heavy equipment. 20 decibels (dBA). 85 decibels (dBA). 10 decibels (dBA). 30 decibels (dBA). None 43. Which is the correct procedure to de-energize an electric circuit? Lock, tag, clear and try Tag, lock, clear and try Lock, tag, try and clear None of the above None 44. The Saudi Aramco General Instruction which sets forth the Work Permit Receiver’s requirement is: GI 2.100 GI 6.200 GI 5.430 GI 1.200 None 45. When can you transfer from a boat to a boat landing (or vice versa) using the swing rope technique? If you have both hand free. During an emergency drill. After you have received the training. When the winds are light. None 46. A straight or extension ladder must extend over the edge of a roof, excavation, or scaffold platform by minimum distance: 0.9 meter 1 foot 4 feet No ser distance None 47. Mobile scaffold shall have a maximum height of: 4 times its biggest base width 4 times its smallest base width 3 times its biggest base width 3 times its smallest base width None of the above None 48. What is the grade of the supplied air for hood and respirators during abrasive blasting? B A C D None 49. The maximum working pressure on an acetylene gauge is _____ PSI: 19.50 7 15 8 None 50. How is transfer from boat to boat landing done safety? Grab the knotted rope when the boat is at the TOP of a swell; swing to the platform; PUSH off with your feet Grab the knotted rope when the boat is on top of the swell; swing to the platform using GRAVITY to pull you to the landing. Grab the knotted rope when the boat is at the BOTTOM of a swell; swing to the platform; PUSH off the boat with your feet Grab the knotted rope when the boat is in BETWEEN swells, swing to the platform; PUSH off the boat with your feet. None 1 out of 5 Please fill in the comment box below. Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Permit Receiver Latest Questions and Answers next post Saudi Aramco & Sabic Work Permit Receiver Question Answers