490 Welcome to your Saudi Aramco Safety Officer Evaluation Online Examlet's get start Name Email 1. Forks shall be tilted back and raised no more than______ above the ground to maintain stability when traveling with loads. 10-20 cm (4-8 inches) not required. 15-20 cm (6-8 inches) 15-30 cm (6-12 inches) None 2. Contractor shall provide one (1) safety Supervisor for: Every 5 safety Officer Every area regardless the number of safety Officer Every 10 safety Officer Every 8 safety Officer None 3. If someone is injured on your job site, a preliminary written report must be submitted to the Saudi Aramco PMT within ________ period of time and final report within _________: 2 hours, 48 hours 1 hour, 48 hours 24 hours, 72 hours 8 hours, 72 hours None 4. A design of straps that may be secured about a person in a manner to distribute the fall arrest forces over the thighs, pelvis, waist, chest and shoulders, with means for attaching the harness to other components of a personal fall arrest system is called: Layard Positioning Device full Body Harness Body Belt None 5. A crane is working near 2 meter deep excavation, minimum distance from the edge shall be: None of the above 2 Meter 3 Meter 1 Meter None 6. What is the first thing you should do if a person falls in the water? Inform the Captain/Maser. Shout “Man Overboard” Throw a floatation device in the water Follow the directions of the Captain/Master None 7. What is the purpose of a hold tag? To explain the reason why the equipment is being locked out To work the job safely To isolate or de-energized equipment All of above None 8. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12” wide True False None 9. Flammable materials storage area cannot be located within_________ of other buildings or structure. 25 ft 100 ft 50 Meters 50 ft None 10. Work platforms must have toe boards, top rails and access ladders once they reach a height of_____: 6 ft 8 ft When the height is four times greater than the base width 4 ft None 11. What is necessary for a worker to wear on a steel beam six feet of more above ground? A full body harness with lanyards attached to an anchor point None of the above A steel belt with steel or brass coupling He must never go on steel beam None 12. Personnel basket shall not be permitted to transfer personnel when the wind speed exceeds _______ or in rough weather 50 km/h (28 knots) 25 km/h (14 knots) 28 km/h (21 knots) 13 km/s (7 knots) None 13. Mobile scaffold shall have a maximum height of: None of the above 4 times its smallest base width 3 times its biggest base width 4 times its biggest base width 3 times its smallest base width None 14. Reverse alarms shall be minimum_____ audible and working on all heavy equipment. 20 decibels (dBA). 85 decibels (dBA). 30 decibels (dBA). 10 decibels (dBA). None 15. A person allowed to operate crane in S.A project, “Select all that apply:” Trainees Under the direct supervision of qualified trainer SAG licensed personnel. Crane maintenance personnel and inspector in the performance of duties S.A. certified crane operator None 16. When can you transfer from a boat to a boat landing (or vice versa) using the swing rope technique? During an emergency drill. When the winds are light. If you have both hand free. After you have received the training. None 17. The Saudi Aramco General Instruction which sets forth the Work Permit Receiver’s requirement is: GI 2.100 GI 6.200 GI 1.200 GI 5.430 None 18. A straight or extension ladder must extend over the edge of a roof, excavation, or scaffold platform by minimum distance: No ser distance 4 feet 1 foot 0.9 meter None 19. Forklifts shall not be left unattended with the engine running. When forklifts are parked the forks shall not be in a raised position. True False None 20. When there is opening in roof work and/or edges of roof, and a fall hazard exist, barricades must be installed capable of withstand a force of: 100 lbs (54.4kg) 150 lbs (68kg) 200 lbs (91kg) 125 lbs (56.7kg) None 21. How should you stand on a moving personnel basket? Stand straight, one foot on the basket rim, hold with both hands. Stand straight, both feet on the basket rim, hold with both hands Lean backward, both feet on the basket rim, hold with both hands. Lean forward, both feet on the basket rim, hold with both hands None 22. Personnel performing work at heights and their supervisors shall: Be trained in the nature of fall hazards in the work area and Undergo refresher training at least every 3 years Demonstrate competency by successfully passing written and practical tests. All of the above None 23. Spray Painting requires? No wind A good spray Work only in spray painting shop A correct air purifying respirator None 24. During storage of oxygen and acetylene gas cylinders they must be separated by (1) A fire Resistant wall or (2) a Distance of______: Not required if tanks are empty 20 feet 50 feet None of the above None 25. What is the grade of the supplied air for hood and respirators during abrasive blasting? A D B C None 26. The soil type that is least stable in an excavation is: Type B Type C None of the above Type A None 27. How is transfer from boat to boat landing done safety? Grab the knotted rope when the boat is at the TOP of a swell; swing to the platform; PUSH off with your feet Grab the knotted rope when the boat is on top of the swell; swing to the platform using GRAVITY to pull you to the landing. Grab the knotted rope when the boat is at the BOTTOM of a swell; swing to the platform; PUSH off the boat with your feet Grab the knotted rope when the boat is in BETWEEN swells, swing to the platform; PUSH off the boat with your feet. None 28. which of the statement is correct, “Select all that apply:” A special scaffold is: Cantilevered scaffold by more than 3 meters (10 feet) Formwork shoring constructed of scaffolding materials and supporting an elevated concrete slab/deck more than 100 mm (4 inches) thick Scaffold supported by or hung from wind girders or roof / floating roof tanks Over 42 metres None 29. The maximum working pressure on an acetylene gauge is ________ psig. 20 7 15 10 None 30. Moving machine parts shall be ________ if located 2.5m(8.2ft) or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. Eliminated Removed Separated Guarded None 31. Which of the following factors does affect the load capacity of a mobile crane? Boom angle Boom length Extending the out rigger fully Installation of an anti-two block device None 32. Light duty scaffold designed and constructed to carry the: All of the above no material storage other than the weight of tools weight of personnel only Uniformly distributed maximum intended load is 120 kg/m2 (1.2 kN/m2) (25 lb/ft2). None 33. What is the permissible noise exposure for an eight hours work shift? 90 100 80 120 None 34. Moving machinery parts shall be guarded if located ________or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. 2m 1.5m 1.8 (6ft) 2.5 m (8.2 ft) None 35. Flammable materials storage areas cannot be located within________ of other buildings or Structures: 100 ft 50 ft 50 meters 25 ft None 36. How many clips are required to construct an eye in a one half inch wire rope? 4 clips with U bolts on the dead end 3 clips with U bolt on the dead end 3 clips with U bolts on the live end 4 clips with U bolts on the live end None 37. The maximum voltage permitted for portable power tool in construction site is: 240 Volt 220 Volt 150 Volt 110 Volt None 38. Forklifts shall be equipped with, “Select all that apply:” Seatbelts Overhead protection A backup warning alarm A fire extinguisher All of the above None 39. If someone is injured on your job site, a preliminary written report must submitted to the Saudi Aramco PMT within _________ period of time: 24 Hours 2 Hours 3 Days 8 Hours None 40. Which is the correct procedure to de-energize an electric circuit? Lock, tag, clear and try Tag, lock, clear and try Lock, tag, try and clear None of the above None 41. The ratio of vertical to horizontal spacing for a straight or extension ladder is: 3 to 1 4 to 1 1 to 1 2 to 1 None 42. When grinding a piece of metal with a portable power grinder, the type of Personal Protective Equipment required is: Goggles only Face shield only Safety glasses/face shield combination Safety glass only None 43. When checking the ground on a duplex outlet, which of the following provides the best method? Check the continuity between white wire and the outlet box Check the continuity between green wire and the building ground Check the continuity between the block and the white wire Check the continuity between green wire and the outlet box None 44. Hold tags and locks are primary intended to protect the individual who is doing the work from? Being thrown in jail Leaving until the work is completed Sleeping Being injured in case of accident start up None 45. Where is a work permit required? In areas designated by the department manager as requiring a work permit All Saudi Aramco Areas Construction work shop None of the above None 46. Who is allowed to perform abrasive blasting? All Saudi Aramco employees and Contractor with 3rd party certification All Saudi Aramco certified employees and Contractor All Saudi Aramco employees and Contractor Contractor abrasive blasters None 47. The maximum working pressure on an acetylene gauge is _____ PSI: 7 15 19.50 8 None 48. Whenever there is any doubt as to safety of the lift, the crane operator shall: Stop all hoisting activities. a and b only Refuse to handle unsafe loads Discuss the matter with the signal man None 49. How long is a work permit usually valid 1 Week 1 Day 1 Month 1 Shift None 50. Minimum period of time the appointed “fire watch” remain at the site of HOT work after the activity has stopped 15 minutes 30 minutes 60 minutes 10 minutes None 1 out of 5 Please fill in the comment box below. Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Permit Receiver Latest Questions and Answers next post Saudi Aramco & Sabic Work Permit Receiver Question Answers