462 Welcome to your Saudi Aramco Safety Officer Evaluation Online Exam let's get start Name Email 1. Who is allowed to perform abrasive blasting? Contractor abrasive blasters All Saudi Aramco employees and Contractor All Saudi Aramco employees and Contractor with 3rd party certification All Saudi Aramco certified employees and Contractor None 2. Work platforms must have toe boards, top rails and access ladders once they reach a height of_____: 6 ft 4 ft When the height is four times greater than the base width 8 ft None 3. A straight or extension ladder must extend over the edge of a roof, excavation, or scaffold platform by minimum distance: 4 feet 1 foot No ser distance 0.9 meter None 4. Moving machine parts shall be ________ if located 2.5m(8.2ft) or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. Guarded Separated Eliminated Removed None 5. Flammable materials storage areas cannot be located within________ of other buildings or Structures: 25 ft 50 ft 100 ft 50 meters None 6. Which is the correct procedure to de-energize an electric circuit? Lock, tag, try and clear Lock, tag, clear and try None of the above Tag, lock, clear and try None 7. Forklifts shall not be left unattended with the engine running. When forklifts are parked the forks shall not be in a raised position. False True None 8. When can you transfer from a boat to a boat landing (or vice versa) using the swing rope technique? If you have both hand free. During an emergency drill. After you have received the training. When the winds are light. None 9. Which of the following factors does affect the load capacity of a mobile crane? Installation of an anti-two block device Boom angle Boom length Extending the out rigger fully None 10. Personnel basket shall not be permitted to transfer personnel when the wind speed exceeds _______ or in rough weather 25 km/h (14 knots) 13 km/s (7 knots) 28 km/h (21 knots) 50 km/h (28 knots) None 11. Personnel performing work at heights and their supervisors shall: Demonstrate competency by successfully passing written and practical tests. Be trained in the nature of fall hazards in the work area and Undergo refresher training at least every 3 years All of the above None 12. Flammable materials storage area cannot be located within_________ of other buildings or structure. 50 Meters 100 ft 25 ft 50 ft None 13. The maximum working pressure on an acetylene gauge is _____ PSI: 7 19.50 8 15 None 14. When there is opening in roof work and/or edges of roof, and a fall hazard exist, barricades must be installed capable of withstand a force of: 200 lbs (91kg) 100 lbs (54.4kg) 125 lbs (56.7kg) 150 lbs (68kg) None 15. Spray Painting requires? A correct air purifying respirator A good spray No wind Work only in spray painting shop None 16. What is the permissible noise exposure for an eight hours work shift? 100 80 90 120 None 17. Contractor shall provide one (1) safety Supervisor for: Every 10 safety Officer Every 5 safety Officer Every 8 safety Officer Every area regardless the number of safety Officer None 18. Forks shall be tilted back and raised no more than______ above the ground to maintain stability when traveling with loads. 15-20 cm (6-8 inches) 15-30 cm (6-12 inches) not required. 10-20 cm (4-8 inches) None 19. What is the grade of the supplied air for hood and respirators during abrasive blasting? B C A D None 20. What is the first thing you should do if a person falls in the water? Throw a floatation device in the water Follow the directions of the Captain/Master Shout “Man Overboard” Inform the Captain/Maser. None 21. Where is a work permit required? All Saudi Aramco Areas None of the above Construction work shop In areas designated by the department manager as requiring a work permit None 22. Hold tags and locks are primary intended to protect the individual who is doing the work from? Sleeping Being thrown in jail Leaving until the work is completed Being injured in case of accident start up None 23. If someone is injured on your job site, a preliminary written report must be submitted to the Saudi Aramco PMT within ________ period of time and final report within _________: 1 hour, 48 hours 2 hours, 48 hours 8 hours, 72 hours 24 hours, 72 hours None 24. The maximum voltage permitted for portable power tool in construction site is: 220 Volt 240 Volt 150 Volt 110 Volt None 25. Light duty scaffold designed and constructed to carry the: Uniformly distributed maximum intended load is 120 kg/m2 (1.2 kN/m2) (25 lb/ft2). All of the above weight of personnel only no material storage other than the weight of tools None 26. How is transfer from boat to boat landing done safety? Grab the knotted rope when the boat is on top of the swell; swing to the platform using GRAVITY to pull you to the landing. Grab the knotted rope when the boat is in BETWEEN swells, swing to the platform; PUSH off the boat with your feet. Grab the knotted rope when the boat is at the TOP of a swell; swing to the platform; PUSH off with your feet Grab the knotted rope when the boat is at the BOTTOM of a swell; swing to the platform; PUSH off the boat with your feet None 27. The Saudi Aramco General Instruction which sets forth the Work Permit Receiver’s requirement is: GI 5.430 GI 1.200 GI 2.100 GI 6.200 None 28. Mobile scaffold shall have a maximum height of: 3 times its biggest base width 3 times its smallest base width 4 times its biggest base width None of the above 4 times its smallest base width None 29. A person allowed to operate crane in S.A project, “Select all that apply:” Crane maintenance personnel and inspector in the performance of duties SAG licensed personnel. Trainees Under the direct supervision of qualified trainer S.A. certified crane operator None 30. which of the statement is correct, “Select all that apply:” A special scaffold is: Cantilevered scaffold by more than 3 meters (10 feet) Scaffold supported by or hung from wind girders or roof / floating roof tanks Formwork shoring constructed of scaffolding materials and supporting an elevated concrete slab/deck more than 100 mm (4 inches) thick Over 42 metres None 31. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12” wide False True None 32. When checking the ground on a duplex outlet, which of the following provides the best method? Check the continuity between the block and the white wire Check the continuity between green wire and the building ground Check the continuity between white wire and the outlet box Check the continuity between green wire and the outlet box None 33. The ratio of vertical to horizontal spacing for a straight or extension ladder is: 4 to 1 1 to 1 3 to 1 2 to 1 None 34. How many clips are required to construct an eye in a one half inch wire rope? 3 clips with U bolts on the live end 3 clips with U bolt on the dead end 4 clips with U bolts on the dead end 4 clips with U bolts on the live end None 35. What is necessary for a worker to wear on a steel beam six feet of more above ground? He must never go on steel beam None of the above A full body harness with lanyards attached to an anchor point A steel belt with steel or brass coupling None 36. During storage of oxygen and acetylene gas cylinders they must be separated by (1) A fire Resistant wall or (2) a Distance of______: None of the above 50 feet 20 feet Not required if tanks are empty None 37. The maximum working pressure on an acetylene gauge is ________ psig. 7 20 15 10 None 38. How should you stand on a moving personnel basket? Lean forward, both feet on the basket rim, hold with both hands Lean backward, both feet on the basket rim, hold with both hands. Stand straight, both feet on the basket rim, hold with both hands Stand straight, one foot on the basket rim, hold with both hands. None 39. If someone is injured on your job site, a preliminary written report must submitted to the Saudi Aramco PMT within _________ period of time: 3 Days 2 Hours 24 Hours 8 Hours None 40. Whenever there is any doubt as to safety of the lift, the crane operator shall: a and b only Discuss the matter with the signal man Stop all hoisting activities. Refuse to handle unsafe loads None 41. A design of straps that may be secured about a person in a manner to distribute the fall arrest forces over the thighs, pelvis, waist, chest and shoulders, with means for attaching the harness to other components of a personal fall arrest system is called: Positioning Device full Body Harness Layard Body Belt None 42. When grinding a piece of metal with a portable power grinder, the type of Personal Protective Equipment required is: Goggles only Safety glasses/face shield combination Safety glass only Face shield only None 43. How long is a work permit usually valid 1 Month 1 Shift 1 Day 1 Week None 44. Reverse alarms shall be minimum_____ audible and working on all heavy equipment. 85 decibels (dBA). 10 decibels (dBA). 30 decibels (dBA). 20 decibels (dBA). None 45. Minimum period of time the appointed “fire watch” remain at the site of HOT work after the activity has stopped 60 minutes 15 minutes 10 minutes 30 minutes None 46. The soil type that is least stable in an excavation is: Type C Type A Type B None of the above None 47. Moving machinery parts shall be guarded if located ________or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. 2.5 m (8.2 ft) 2m 1.5m 1.8 (6ft) None 48. What is the purpose of a hold tag? To work the job safely To explain the reason why the equipment is being locked out All of above To isolate or de-energized equipment None 49. Forklifts shall be equipped with, “Select all that apply:” All of the above Seatbelts A backup warning alarm Overhead protection A fire extinguisher None 50. A crane is working near 2 meter deep excavation, minimum distance from the edge shall be: 3 Meter 2 Meter None of the above 1 Meter None 1 out of 5 Please fill in the comment box below. Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Permit Receiver Latest Questions and Answers next post Saudi Aramco & Sabic Work Permit Receiver Question Answers