448 Welcome to your Saudi Aramco Safety Officer Evaluation Online Exam let's get start Name Email 1. which of the statement is correct, “Select all that apply:” A special scaffold is: Scaffold supported by or hung from wind girders or roof / floating roof tanks Cantilevered scaffold by more than 3 meters (10 feet) Formwork shoring constructed of scaffolding materials and supporting an elevated concrete slab/deck more than 100 mm (4 inches) thick Over 42 metres None 2. A straight or extension ladder must extend over the edge of a roof, excavation, or scaffold platform by minimum distance: 0.9 meter 4 feet No ser distance 1 foot None 3. A person allowed to operate crane in S.A project, “Select all that apply:” SAG licensed personnel. Trainees Under the direct supervision of qualified trainer Crane maintenance personnel and inspector in the performance of duties S.A. certified crane operator None 4. The maximum voltage permitted for portable power tool in construction site is: 240 Volt 220 Volt 110 Volt 150 Volt None 5. Flammable materials storage area cannot be located within_________ of other buildings or structure. 25 ft 50 ft 50 Meters 100 ft None 6. When there is opening in roof work and/or edges of roof, and a fall hazard exist, barricades must be installed capable of withstand a force of: 200 lbs (91kg) 125 lbs (56.7kg) 100 lbs (54.4kg) 150 lbs (68kg) None 7. When checking the ground on a duplex outlet, which of the following provides the best method? Check the continuity between green wire and the outlet box Check the continuity between green wire and the building ground Check the continuity between white wire and the outlet box Check the continuity between the block and the white wire None 8. Which of the following factors does affect the load capacity of a mobile crane? Installation of an anti-two block device Extending the out rigger fully Boom length Boom angle None 9. A crane is working near 2 meter deep excavation, minimum distance from the edge shall be: 1 Meter None of the above 2 Meter 3 Meter None 10. Forklifts shall not be left unattended with the engine running. When forklifts are parked the forks shall not be in a raised position. True False None 11. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12” wide True False None 12. Mobile scaffold shall have a maximum height of: 3 times its biggest base width 3 times its smallest base width 4 times its biggest base width 4 times its smallest base width None of the above None 13. A design of straps that may be secured about a person in a manner to distribute the fall arrest forces over the thighs, pelvis, waist, chest and shoulders, with means for attaching the harness to other components of a personal fall arrest system is called: full Body Harness Body Belt Layard Positioning Device None 14. The soil type that is least stable in an excavation is: Type C Type B None of the above Type A None 15. Forklifts shall be equipped with, “Select all that apply:” A fire extinguisher Overhead protection All of the above Seatbelts A backup warning alarm None 16. When can you transfer from a boat to a boat landing (or vice versa) using the swing rope technique? When the winds are light. After you have received the training. If you have both hand free. During an emergency drill. None 17. The maximum working pressure on an acetylene gauge is _____ PSI: 8 7 19.50 15 None 18. Spray Painting requires? A correct air purifying respirator No wind Work only in spray painting shop A good spray None 19. Personnel basket shall not be permitted to transfer personnel when the wind speed exceeds _______ or in rough weather 50 km/h (28 knots) 28 km/h (21 knots) 13 km/s (7 knots) 25 km/h (14 knots) None 20. What is the first thing you should do if a person falls in the water? Shout “Man Overboard” Inform the Captain/Maser. Follow the directions of the Captain/Master Throw a floatation device in the water None 21. Moving machine parts shall be ________ if located 2.5m(8.2ft) or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. Guarded Separated Removed Eliminated None 22. When grinding a piece of metal with a portable power grinder, the type of Personal Protective Equipment required is: Safety glasses/face shield combination Safety glass only Goggles only Face shield only None 23. Light duty scaffold designed and constructed to carry the: All of the above weight of personnel only Uniformly distributed maximum intended load is 120 kg/m2 (1.2 kN/m2) (25 lb/ft2). no material storage other than the weight of tools None 24. Moving machinery parts shall be guarded if located ________or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. 2m 2.5 m (8.2 ft) 1.5m 1.8 (6ft) None 25. Minimum period of time the appointed “fire watch” remain at the site of HOT work after the activity has stopped 10 minutes 15 minutes 60 minutes 30 minutes None 26. How many clips are required to construct an eye in a one half inch wire rope? 4 clips with U bolts on the live end 3 clips with U bolt on the dead end 4 clips with U bolts on the dead end 3 clips with U bolts on the live end None 27. Who is allowed to perform abrasive blasting? All Saudi Aramco certified employees and Contractor All Saudi Aramco employees and Contractor All Saudi Aramco employees and Contractor with 3rd party certification Contractor abrasive blasters None 28. Which is the correct procedure to de-energize an electric circuit? None of the above Lock, tag, try and clear Lock, tag, clear and try Tag, lock, clear and try None 29. Where is a work permit required? None of the above Construction work shop In areas designated by the department manager as requiring a work permit All Saudi Aramco Areas None 30. How is transfer from boat to boat landing done safety? Grab the knotted rope when the boat is at the BOTTOM of a swell; swing to the platform; PUSH off the boat with your feet Grab the knotted rope when the boat is in BETWEEN swells, swing to the platform; PUSH off the boat with your feet. Grab the knotted rope when the boat is on top of the swell; swing to the platform using GRAVITY to pull you to the landing. Grab the knotted rope when the boat is at the TOP of a swell; swing to the platform; PUSH off with your feet None 31. Reverse alarms shall be minimum_____ audible and working on all heavy equipment. 30 decibels (dBA). 85 decibels (dBA). 20 decibels (dBA). 10 decibels (dBA). None 32. Personnel performing work at heights and their supervisors shall: Be trained in the nature of fall hazards in the work area and Undergo refresher training at least every 3 years Demonstrate competency by successfully passing written and practical tests. All of the above None 33. If someone is injured on your job site, a preliminary written report must submitted to the Saudi Aramco PMT within _________ period of time: 3 Days 2 Hours 24 Hours 8 Hours None 34. If someone is injured on your job site, a preliminary written report must be submitted to the Saudi Aramco PMT within ________ period of time and final report within _________: 1 hour, 48 hours 8 hours, 72 hours 2 hours, 48 hours 24 hours, 72 hours None 35. Contractor shall provide one (1) safety Supervisor for: Every 8 safety Officer Every area regardless the number of safety Officer Every 10 safety Officer Every 5 safety Officer None 36. Work platforms must have toe boards, top rails and access ladders once they reach a height of_____: 6 ft 8 ft When the height is four times greater than the base width 4 ft None 37. The ratio of vertical to horizontal spacing for a straight or extension ladder is: 2 to 1 3 to 1 1 to 1 4 to 1 None 38. What is necessary for a worker to wear on a steel beam six feet of more above ground? A full body harness with lanyards attached to an anchor point He must never go on steel beam None of the above A steel belt with steel or brass coupling None 39. What is the purpose of a hold tag? To work the job safely To explain the reason why the equipment is being locked out To isolate or de-energized equipment All of above None 40. Flammable materials storage areas cannot be located within________ of other buildings or Structures: 100 ft 50 meters 25 ft 50 ft None 41. Whenever there is any doubt as to safety of the lift, the crane operator shall: Discuss the matter with the signal man Stop all hoisting activities. Refuse to handle unsafe loads a and b only None 42. How long is a work permit usually valid 1 Day 1 Week 1 Month 1 Shift None 43. The maximum working pressure on an acetylene gauge is ________ psig. 10 15 20 7 None 44. What is the grade of the supplied air for hood and respirators during abrasive blasting? C A D B None 45. The Saudi Aramco General Instruction which sets forth the Work Permit Receiver’s requirement is: GI 2.100 GI 1.200 GI 5.430 GI 6.200 None 46. During storage of oxygen and acetylene gas cylinders they must be separated by (1) A fire Resistant wall or (2) a Distance of______: Not required if tanks are empty None of the above 20 feet 50 feet None 47. What is the permissible noise exposure for an eight hours work shift? 90 80 120 100 None 48. Forks shall be tilted back and raised no more than______ above the ground to maintain stability when traveling with loads. 15-30 cm (6-12 inches) 10-20 cm (4-8 inches) not required. 15-20 cm (6-8 inches) None 49. How should you stand on a moving personnel basket? Lean forward, both feet on the basket rim, hold with both hands Lean backward, both feet on the basket rim, hold with both hands. Stand straight, both feet on the basket rim, hold with both hands Stand straight, one foot on the basket rim, hold with both hands. None 50. Hold tags and locks are primary intended to protect the individual who is doing the work from? Being injured in case of accident start up Leaving until the work is completed Being thrown in jail Sleeping None 1 out of 5 Please fill in the comment box below. Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Permit Receiver Latest Questions and Answers next post Saudi Aramco & Sabic Work Permit Receiver Question Answers