404 Welcome to your Saudi Aramco Safety Officer Evaluation Online Exam let's get start Name Email 1. Which is the correct procedure to de-energize an electric circuit? Lock, tag, clear and try Lock, tag, try and clear None of the above Tag, lock, clear and try None 2. Forklifts shall be equipped with, “Select all that apply:” Overhead protection Seatbelts A backup warning alarm A fire extinguisher All of the above None 3. Contractor shall provide one (1) safety Supervisor for: Every area regardless the number of safety Officer Every 8 safety Officer Every 10 safety Officer Every 5 safety Officer None 4. How should you stand on a moving personnel basket? Stand straight, one foot on the basket rim, hold with both hands. Lean forward, both feet on the basket rim, hold with both hands Lean backward, both feet on the basket rim, hold with both hands. Stand straight, both feet on the basket rim, hold with both hands None 5. The maximum voltage permitted for portable power tool in construction site is: 150 Volt 240 Volt 110 Volt 220 Volt None 6. Mobile scaffold shall have a maximum height of: 3 times its smallest base width 4 times its smallest base width 3 times its biggest base width None of the above 4 times its biggest base width None 7. When grinding a piece of metal with a portable power grinder, the type of Personal Protective Equipment required is: Safety glasses/face shield combination Goggles only Face shield only Safety glass only None 8. What is the purpose of a hold tag? All of above To explain the reason why the equipment is being locked out To isolate or de-energized equipment To work the job safely None 9. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12” wide True False None 10. Moving machinery parts shall be guarded if located ________or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. 2.5 m (8.2 ft) 1.5m 2m 1.8 (6ft) None 11. The maximum working pressure on an acetylene gauge is _____ PSI: 7 15 19.50 8 None 12. When checking the ground on a duplex outlet, which of the following provides the best method? Check the continuity between white wire and the outlet box Check the continuity between green wire and the building ground Check the continuity between green wire and the outlet box Check the continuity between the block and the white wire None 13. If someone is injured on your job site, a preliminary written report must submitted to the Saudi Aramco PMT within _________ period of time: 3 Days 8 Hours 2 Hours 24 Hours None 14. How is transfer from boat to boat landing done safety? Grab the knotted rope when the boat is at the TOP of a swell; swing to the platform; PUSH off with your feet Grab the knotted rope when the boat is at the BOTTOM of a swell; swing to the platform; PUSH off the boat with your feet Grab the knotted rope when the boat is on top of the swell; swing to the platform using GRAVITY to pull you to the landing. Grab the knotted rope when the boat is in BETWEEN swells, swing to the platform; PUSH off the boat with your feet. None 15. What is the grade of the supplied air for hood and respirators during abrasive blasting? D A C B None 16. How many clips are required to construct an eye in a one half inch wire rope? 3 clips with U bolt on the dead end 3 clips with U bolts on the live end 4 clips with U bolts on the dead end 4 clips with U bolts on the live end None 17. When there is opening in roof work and/or edges of roof, and a fall hazard exist, barricades must be installed capable of withstand a force of: 100 lbs (54.4kg) 150 lbs (68kg) 125 lbs (56.7kg) 200 lbs (91kg) None 18. Flammable materials storage area cannot be located within_________ of other buildings or structure. 50 ft 25 ft 50 Meters 100 ft None 19. What is the permissible noise exposure for an eight hours work shift? 80 100 90 120 None 20. The maximum working pressure on an acetylene gauge is ________ psig. 15 7 20 10 None 21. Forks shall be tilted back and raised no more than______ above the ground to maintain stability when traveling with loads. 15-20 cm (6-8 inches) 10-20 cm (4-8 inches) not required. 15-30 cm (6-12 inches) None 22. Forklifts shall not be left unattended with the engine running. When forklifts are parked the forks shall not be in a raised position. False True None 23. The soil type that is least stable in an excavation is: Type A Type C None of the above Type B None 24. Which of the following factors does affect the load capacity of a mobile crane? Extending the out rigger fully Installation of an anti-two block device Boom angle Boom length None 25. Who is allowed to perform abrasive blasting? Contractor abrasive blasters All Saudi Aramco employees and Contractor with 3rd party certification All Saudi Aramco certified employees and Contractor All Saudi Aramco employees and Contractor None 26. which of the statement is correct, “Select all that apply:” A special scaffold is: Over 42 metres Scaffold supported by or hung from wind girders or roof / floating roof tanks Cantilevered scaffold by more than 3 meters (10 feet) Formwork shoring constructed of scaffolding materials and supporting an elevated concrete slab/deck more than 100 mm (4 inches) thick None 27. Spray Painting requires? A correct air purifying respirator Work only in spray painting shop No wind A good spray None 28. A design of straps that may be secured about a person in a manner to distribute the fall arrest forces over the thighs, pelvis, waist, chest and shoulders, with means for attaching the harness to other components of a personal fall arrest system is called: Layard Positioning Device Body Belt full Body Harness None 29. Whenever there is any doubt as to safety of the lift, the crane operator shall: Stop all hoisting activities. Discuss the matter with the signal man Refuse to handle unsafe loads a and b only None 30. A straight or extension ladder must extend over the edge of a roof, excavation, or scaffold platform by minimum distance: 4 feet 0.9 meter 1 foot No ser distance None 31. Reverse alarms shall be minimum_____ audible and working on all heavy equipment. 85 decibels (dBA). 20 decibels (dBA). 10 decibels (dBA). 30 decibels (dBA). None 32. Moving machine parts shall be ________ if located 2.5m(8.2ft) or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. Removed Guarded Eliminated Separated None 33. When can you transfer from a boat to a boat landing (or vice versa) using the swing rope technique? After you have received the training. During an emergency drill. When the winds are light. If you have both hand free. None 34. Light duty scaffold designed and constructed to carry the: weight of personnel only no material storage other than the weight of tools All of the above Uniformly distributed maximum intended load is 120 kg/m2 (1.2 kN/m2) (25 lb/ft2). None 35. What is the first thing you should do if a person falls in the water? Throw a floatation device in the water Inform the Captain/Maser. Follow the directions of the Captain/Master Shout “Man Overboard” None 36. During storage of oxygen and acetylene gas cylinders they must be separated by (1) A fire Resistant wall or (2) a Distance of______: Not required if tanks are empty 50 feet None of the above 20 feet None 37. How long is a work permit usually valid 1 Week 1 Day 1 Month 1 Shift None 38. Personnel basket shall not be permitted to transfer personnel when the wind speed exceeds _______ or in rough weather 28 km/h (21 knots) 25 km/h (14 knots) 50 km/h (28 knots) 13 km/s (7 knots) None 39. The ratio of vertical to horizontal spacing for a straight or extension ladder is: 4 to 1 3 to 1 2 to 1 1 to 1 None 40. The Saudi Aramco General Instruction which sets forth the Work Permit Receiver’s requirement is: GI 2.100 GI 5.430 GI 6.200 GI 1.200 None 41. If someone is injured on your job site, a preliminary written report must be submitted to the Saudi Aramco PMT within ________ period of time and final report within _________: 8 hours, 72 hours 2 hours, 48 hours 24 hours, 72 hours 1 hour, 48 hours None 42. Where is a work permit required? In areas designated by the department manager as requiring a work permit Construction work shop None of the above All Saudi Aramco Areas None 43. Minimum period of time the appointed “fire watch” remain at the site of HOT work after the activity has stopped 30 minutes 15 minutes 60 minutes 10 minutes None 44. Work platforms must have toe boards, top rails and access ladders once they reach a height of_____: When the height is four times greater than the base width 4 ft 8 ft 6 ft None 45. What is necessary for a worker to wear on a steel beam six feet of more above ground? None of the above A full body harness with lanyards attached to an anchor point A steel belt with steel or brass coupling He must never go on steel beam None 46. A crane is working near 2 meter deep excavation, minimum distance from the edge shall be: 3 Meter 1 Meter 2 Meter None of the above None 47. Flammable materials storage areas cannot be located within________ of other buildings or Structures: 50 ft 25 ft 50 meters 100 ft None 48. A person allowed to operate crane in S.A project, “Select all that apply:” S.A. certified crane operator SAG licensed personnel. Trainees Under the direct supervision of qualified trainer Crane maintenance personnel and inspector in the performance of duties None 49. Hold tags and locks are primary intended to protect the individual who is doing the work from? Sleeping Being injured in case of accident start up Being thrown in jail Leaving until the work is completed None 50. Personnel performing work at heights and their supervisors shall: Be trained in the nature of fall hazards in the work area and Undergo refresher training at least every 3 years All of the above Demonstrate competency by successfully passing written and practical tests. None 1 out of 5 Please fill in the comment box below. Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Permit Receiver Latest Questions and Answers next post Saudi Aramco & Sabic Work Permit Receiver Question Answers