547 Welcome to your Saudi Aramco Safety Officer Evaluation Online Examlet's get start Name Email 1. The Saudi Aramco General Instruction which sets forth the Work Permit Receiver’s requirement is: GI 2.100 GI 1.200 GI 6.200 GI 5.430 None 2. Flammable materials storage areas cannot be located within________ of other buildings or Structures: 50 ft 100 ft 50 meters 25 ft None 3. Forklifts shall be equipped with, “Select all that apply:” Seatbelts Overhead protection A fire extinguisher All of the above A backup warning alarm None 4. Forklifts shall not be left unattended with the engine running. When forklifts are parked the forks shall not be in a raised position. True False None 5. Minimum period of time the appointed “fire watch” remain at the site of HOT work after the activity has stopped 15 minutes 30 minutes 60 minutes 10 minutes None 6. A straight or extension ladder must extend over the edge of a roof, excavation, or scaffold platform by minimum distance: 0.9 meter 1 foot No ser distance 4 feet None 7. Forks shall be tilted back and raised no more than______ above the ground to maintain stability when traveling with loads. 10-20 cm (4-8 inches) 15-30 cm (6-12 inches) not required. 15-20 cm (6-8 inches) None 8. Which of the following factors does affect the load capacity of a mobile crane? Boom length Installation of an anti-two block device Boom angle Extending the out rigger fully None 9. The maximum working pressure on an acetylene gauge is _____ PSI: 8 15 19.50 7 None 10. Contractor shall provide one (1) safety Supervisor for: Every 5 safety Officer Every area regardless the number of safety Officer Every 8 safety Officer Every 10 safety Officer None 11. Personnel performing work at heights and their supervisors shall: Be trained in the nature of fall hazards in the work area and Undergo refresher training at least every 3 years Demonstrate competency by successfully passing written and practical tests. All of the above None 12. Who is allowed to perform abrasive blasting? Contractor abrasive blasters All Saudi Aramco certified employees and Contractor All Saudi Aramco employees and Contractor All Saudi Aramco employees and Contractor with 3rd party certification None 13. The ratio of vertical to horizontal spacing for a straight or extension ladder is: 1 to 1 3 to 1 4 to 1 2 to 1 None 14. Whenever there is any doubt as to safety of the lift, the crane operator shall: Stop all hoisting activities. Refuse to handle unsafe loads a and b only Discuss the matter with the signal man None 15. The soil type that is least stable in an excavation is: Type C None of the above Type A Type B None 16. Which is the correct procedure to de-energize an electric circuit? Tag, lock, clear and try None of the above Lock, tag, try and clear Lock, tag, clear and try None 17. Light duty scaffold designed and constructed to carry the: no material storage other than the weight of tools Uniformly distributed maximum intended load is 120 kg/m2 (1.2 kN/m2) (25 lb/ft2). All of the above weight of personnel only None 18. The maximum voltage permitted for portable power tool in construction site is: 220 Volt 150 Volt 110 Volt 240 Volt None 19. What is the first thing you should do if a person falls in the water? Follow the directions of the Captain/Master Inform the Captain/Maser. Shout “Man Overboard” Throw a floatation device in the water None 20. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12” wide False True None 21. How should you stand on a moving personnel basket? Lean backward, both feet on the basket rim, hold with both hands. Stand straight, both feet on the basket rim, hold with both hands Lean forward, both feet on the basket rim, hold with both hands Stand straight, one foot on the basket rim, hold with both hands. None 22. What is the purpose of a hold tag? To explain the reason why the equipment is being locked out To work the job safely All of above To isolate or de-energized equipment None 23. A crane is working near 2 meter deep excavation, minimum distance from the edge shall be: None of the above 1 Meter 3 Meter 2 Meter None 24. If someone is injured on your job site, a preliminary written report must be submitted to the Saudi Aramco PMT within ________ period of time and final report within _________: 1 hour, 48 hours 8 hours, 72 hours 2 hours, 48 hours 24 hours, 72 hours None 25. When can you transfer from a boat to a boat landing (or vice versa) using the swing rope technique? When the winds are light. During an emergency drill. If you have both hand free. After you have received the training. None 26. What is the permissible noise exposure for an eight hours work shift? 100 80 120 90 None 27. Hold tags and locks are primary intended to protect the individual who is doing the work from? Being thrown in jail Leaving until the work is completed Sleeping Being injured in case of accident start up None 28. Moving machine parts shall be ________ if located 2.5m(8.2ft) or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. Separated Guarded Eliminated Removed None 29. Where is a work permit required? None of the above All Saudi Aramco Areas Construction work shop In areas designated by the department manager as requiring a work permit None 30. Flammable materials storage area cannot be located within_________ of other buildings or structure. 50 Meters 100 ft 50 ft 25 ft None 31. How many clips are required to construct an eye in a one half inch wire rope? 3 clips with U bolt on the dead end 3 clips with U bolts on the live end 4 clips with U bolts on the live end 4 clips with U bolts on the dead end None 32. which of the statement is correct, “Select all that apply:” A special scaffold is: Cantilevered scaffold by more than 3 meters (10 feet) Formwork shoring constructed of scaffolding materials and supporting an elevated concrete slab/deck more than 100 mm (4 inches) thick Over 42 metres Scaffold supported by or hung from wind girders or roof / floating roof tanks None 33. Moving machinery parts shall be guarded if located ________or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. 1.5m 1.8 (6ft) 2.5 m (8.2 ft) 2m None 34. What is necessary for a worker to wear on a steel beam six feet of more above ground? A full body harness with lanyards attached to an anchor point None of the above A steel belt with steel or brass coupling He must never go on steel beam None 35. Spray Painting requires? No wind A good spray Work only in spray painting shop A correct air purifying respirator None 36. Mobile scaffold shall have a maximum height of: 3 times its biggest base width 3 times its smallest base width 4 times its biggest base width 4 times its smallest base width None of the above None 37. A person allowed to operate crane in S.A project, “Select all that apply:” Trainees Under the direct supervision of qualified trainer SAG licensed personnel. Crane maintenance personnel and inspector in the performance of duties S.A. certified crane operator None 38. Work platforms must have toe boards, top rails and access ladders once they reach a height of_____: When the height is four times greater than the base width 4 ft 6 ft 8 ft None 39. When checking the ground on a duplex outlet, which of the following provides the best method? Check the continuity between white wire and the outlet box Check the continuity between the block and the white wire Check the continuity between green wire and the building ground Check the continuity between green wire and the outlet box None 40. During storage of oxygen and acetylene gas cylinders they must be separated by (1) A fire Resistant wall or (2) a Distance of______: None of the above 50 feet Not required if tanks are empty 20 feet None 41. The maximum working pressure on an acetylene gauge is ________ psig. 10 15 20 7 None 42. When there is opening in roof work and/or edges of roof, and a fall hazard exist, barricades must be installed capable of withstand a force of: 150 lbs (68kg) 200 lbs (91kg) 100 lbs (54.4kg) 125 lbs (56.7kg) None 43. What is the grade of the supplied air for hood and respirators during abrasive blasting? A D C B None 44. A design of straps that may be secured about a person in a manner to distribute the fall arrest forces over the thighs, pelvis, waist, chest and shoulders, with means for attaching the harness to other components of a personal fall arrest system is called: Layard Positioning Device Body Belt full Body Harness None 45. How long is a work permit usually valid 1 Month 1 Shift 1 Week 1 Day None 46. When grinding a piece of metal with a portable power grinder, the type of Personal Protective Equipment required is: Safety glasses/face shield combination Safety glass only Face shield only Goggles only None 47. If someone is injured on your job site, a preliminary written report must submitted to the Saudi Aramco PMT within _________ period of time: 24 Hours 2 Hours 8 Hours 3 Days None 48. Reverse alarms shall be minimum_____ audible and working on all heavy equipment. 10 decibels (dBA). 85 decibels (dBA). 20 decibels (dBA). 30 decibels (dBA). None 49. How is transfer from boat to boat landing done safety? Grab the knotted rope when the boat is at the TOP of a swell; swing to the platform; PUSH off with your feet Grab the knotted rope when the boat is in BETWEEN swells, swing to the platform; PUSH off the boat with your feet. Grab the knotted rope when the boat is on top of the swell; swing to the platform using GRAVITY to pull you to the landing. Grab the knotted rope when the boat is at the BOTTOM of a swell; swing to the platform; PUSH off the boat with your feet None 50. Personnel basket shall not be permitted to transfer personnel when the wind speed exceeds _______ or in rough weather 50 km/h (28 knots) 25 km/h (14 knots) 13 km/s (7 knots) 28 km/h (21 knots) None 1 out of 5 Please fill in the comment box below. Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Permit Receiver Latest Questions and Answers next post Saudi Aramco & Sabic Work Permit Receiver Question Answers