437 Welcome to your Saudi Aramco Permit Receiver Latest Questions and Answers Name Email 1. Who else must sign and approve work permit that will be used for over sixteen (16) hours? Maintenance Department and Security Department Operations Superintendent and Maintenance Superintendent Inspection Department and Health Department Security Operation and Operation Department None 2. A joint site inspection is only required for__ All Types of work permit Cold work permit only Confined space entry permit only Hot work permit only None 3. What is a Restricted Area? Areas where the Department Manager requiring Work Permit All Aramco Areas Construction Areas Fence Area None 4. Who is responsible in performing the work in accordance with the condition agreed upon with the issuer? Safety Department Receiver Issuer SAPMT None 5. In a confined space entry what is the most important things to do? Gas release ca be made safely Non sparking tools will be used Only hot work can be done Insure that the space is isolated None 6. Gas test is required for Confined space entry only All types of work permit Hot work only Cold work only None 7. A joint site inspection is to be conducted by Security & Safety Officer Issuer & his Foreman Superintendent & Foreman Both Issuer & Receiver None 8. A Lock Hold Tag is for: Only for hot work permit Explaining padlock used on system lock outs Controlling hazard in excavation Replace padlocks and lock our devices None 9. When the issuers determine that the joint site inspection is not required he: Issue cold work permit Issue confined space entry work permit Explain the reason on the work permit lssue hot work permit None 10. Why is it necessary to know the direction of the wind? None of the above To insure that wind will not blow into ignition source To prevent sand from entering into open valves To prevent garbage and dirt to enter at work site None 11. When mechanical & electrical group working in the same equipment in restricted area They will use only one work permit When the maintenance person agree to work without permit Each group must have separate work permit when the foreman & superintendent agree on one work permit None 12. If H2S is present at what level is breathing apparatus required? 5 PPM Above 10 PPM 1 PPM 0.05 to 0.5 PPM None 13. Who is authorized to obtain work permit Certified craftsman Foreman Engineer Aramco Employee None 14. When the operation person has been isolated the unit and install padlock? They can start the job with instruction from foreman The receiver install his own padlock Do the job quickly Get your tools and start the job None 15. Where do we need a work permit? None of these All Saudi Aramco Areas Construction work shop Areas which are designated by the Department Managers None 16. A receiver can stop the job on what condition existing in work area? Unsafe condition existing in work area Transfer to other work area Work is complete End of the shift None 17. A work permit will be closed After the day shift Both Issuer & Receiver signing the permit When the job is completed Before the end shift None 18. A receiver can leave work site Another work location to attend to Has work at least two hours Prior permission from issue Receiver an exit permit None 19. Hot work is not permitted if gases and vapor are measured above what reading on LEL meters? 10% 0.05 LEL 0.10 LEL 0.0 LEL None 20. How many keys will be used in the padlock? One or Two One both issuer & receiver One only Two only None 21. When the operation person install padlock to switchgear Check the field side all equipment are energized None of these Do it quickly Work safely None 22. If an oxygen deficiency is registered at what level is breathing apparatus required? Less than I 0% 25% Less than 20% Greater than fS% None 23. Who is the Work Permit Issuer? Certified Receiver All Aramco employees Supervisor certified by division or department head Foreman or Superintendent None 24. What should be the first thing to do when you need work permit? Get tools ready Shut off the circuit breaker Close valves Present your receiver card to issuer and request the required work permit None 25. When work is stopped by the issuer he should: Close work None of these Leave immediately Pick-up the work permit and write the reason for stopping the work and other relevant information None 1 out of 5 Please fill in the comment box below. Time's upTime is Up! Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Work Permit Receiver Exam next post Saudi Aramco Safety Officer Evaluation Online Exam