394 Welcome to your Saudi Aramco Permit Receiver Latest Questions and Answers Name Email 1. A work permit will be closed Both Issuer & Receiver signing the permit Before the end shift When the job is completed After the day shift None 2. Who is responsible in performing the work in accordance with the condition agreed upon with the issuer? Safety Department Issuer SAPMT Receiver None 3. A receiver can stop the job on what condition existing in work area? Work is complete Transfer to other work area Unsafe condition existing in work area End of the shift None 4. A Lock Hold Tag is for: Replace padlocks and lock our devices Only for hot work permit Explaining padlock used on system lock outs Controlling hazard in excavation None 5. Hot work is not permitted if gases and vapor are measured above what reading on LEL meters? 0.10 LEL 10% 0.0 LEL 0.05 LEL None 6. A receiver can leave work site Receiver an exit permit Another work location to attend to Prior permission from issue Has work at least two hours None 7. In a confined space entry what is the most important things to do? Insure that the space is isolated Only hot work can be done Non sparking tools will be used Gas release ca be made safely None 8. A joint site inspection is to be conducted by Both Issuer & Receiver Superintendent & Foreman Security & Safety Officer Issuer & his Foreman None 9. When the operation person has been isolated the unit and install padlock? They can start the job with instruction from foreman The receiver install his own padlock Do the job quickly Get your tools and start the job None 10. If H2S is present at what level is breathing apparatus required? Above 10 PPM 0.05 to 0.5 PPM 5 PPM 1 PPM None 11. What is a Restricted Area? Areas where the Department Manager requiring Work Permit Fence Area Construction Areas All Aramco Areas None 12. What should be the first thing to do when you need work permit? Get tools ready Shut off the circuit breaker Close valves Present your receiver card to issuer and request the required work permit None 13. Where do we need a work permit? None of these Construction work shop Areas which are designated by the Department Managers All Saudi Aramco Areas None 14. Who is authorized to obtain work permit Engineer Aramco Employee Certified craftsman Foreman None 15. Why is it necessary to know the direction of the wind? To prevent sand from entering into open valves None of the above To insure that wind will not blow into ignition source To prevent garbage and dirt to enter at work site None 16. When work is stopped by the issuer he should: None of these Leave immediately Close work Pick-up the work permit and write the reason for stopping the work and other relevant information None 17. Who is the Work Permit Issuer? All Aramco employees Foreman or Superintendent Certified Receiver Supervisor certified by division or department head None 18. When the issuers determine that the joint site inspection is not required he: lssue hot work permit Issue cold work permit Explain the reason on the work permit Issue confined space entry work permit None 19. A joint site inspection is only required for__ Hot work permit only Cold work permit only All Types of work permit Confined space entry permit only None 20. When mechanical & electrical group working in the same equipment in restricted area When the maintenance person agree to work without permit when the foreman & superintendent agree on one work permit Each group must have separate work permit They will use only one work permit None 21. If an oxygen deficiency is registered at what level is breathing apparatus required? 25% Less than 20% Less than I 0% Greater than fS% None 22. Who else must sign and approve work permit that will be used for over sixteen (16) hours? Security Operation and Operation Department Operations Superintendent and Maintenance Superintendent Maintenance Department and Security Department Inspection Department and Health Department None 23. Gas test is required for Cold work only Confined space entry only All types of work permit Hot work only None 24. When the operation person install padlock to switchgear None of these Check the field side all equipment are energized Do it quickly Work safely None 25. How many keys will be used in the padlock? One both issuer & receiver Two only One only One or Two None 1 out of 5 Please fill in the comment box below. Time's upTime is Up! Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Work Permit Receiver Exam next post Saudi Aramco Safety Officer Evaluation Online Exam