167 Welcome to your Saudi Aramco & Sabic Work Permit Receiver Question Answers let's get start Name Email 1. When working in noisy area what issuer will suggest. Goggle. Gloves. Earmuff. None 2. What must be done when personnel working in the equipment could be injured by residual energy in the equipment? Let him use PPE. Isolate and apply lock and tag. Issue work permit. Do not allow work. None 3. In Saudi Aramco, the maximum safe angle of the slope for type C soil is? None of above 34 (Type C) 54 (Type A) 45 (Type B) None 4. The confined Space Entry permit requires that: Non-sparking tools be used. Only hot work can be done. The confined space is properly isolated. Only cold work can be performed. None 5. Common Hazard in Saudi Aramco are slip, trips and falls, that are caused by: Dry Floors and well-arranged cables Uneven Floor Surfaces and and Changes in Level. Floors with flat surfaces Good Housekeeping None 6. What are ‘hold tags’ used for? To isolate electrical circuit breakers. To explain reasons for locking out equipment. To replace padlocks and lockout devices. For hot work. None 7. When must receiver stop the work? Nobody can stop work. During walkthrough. During inspection. If stated in the duration box. None 8. Who may approve critical lift plans? Rigger II Rigger I Division Head Rigger III None 9. Ladders should extend at least _ ft. above the landing area? 3 5 4 2 None 10. A ____________is anything that can have an adverse impact on your safety. Health Hazard Both health & safety Hazards None of above Safety Hazard None 11. What information the work permit issuer explain to the receiver before issuing EOLB permit? Hazard of permitting. Responsible persons Hazards of the chemical Duration of work permit None 12. A ______________is a work permit process that helps identify, control, eliminate or minimize any hazards before work can begin, and then ensure that the area is safe when the work is complete. Hazard Analysis Checklist Joint Site Inspection Work Permit system Job Safety Analysis (JSA) None 13. In what situation must lock and tag be installed? All types of jobs. When the energy can cause injury. When instructed by the issuer. Before issuing work permit. None 14. What are warning signs use for? Decoration. Identify restricted areas Identify hazard. Identify restricted activities. None 15. How to renew a work permit? The supervisor signed it The issuer and receiver coming on shift sign for renewal The permit receiver sign for renewal The permit issuer sign for renewal None 16. The receiver’s copy of the work permit which is currently in use should be: Kept with the Maintenance or Construction foreman. Posted in the control room. Posted or readily available at the job site. Kept at the Maintenance or Construction office. None 17. Testing of H2S requires SCBA? True False None 18. Any work that develops heat or provides an ignition source in a restricted area requires what type of work permit? Cold Work. Hot Work. Release Permit. Confined Space Entry. None 19. The duration for renewal of work permit is __. Three shifts. No renewal of permit. One shift. Two shifts. None 20. The scaffold inspector must sign the tags for all scaffolds above 6m? False True None 21. Why must the work permit issuer check the crane operator certificate before he issue work permit To identify his company To check the equipment To prove he is competent To make sure he own the equipment None 22. What are the basic safety measures to protect the driver from fall when driving near the excavation? Barricade/blinker light. Standby man/barricade. Signage/standby man Barricade/signage. None 23. Where are work permits required? All Saudi Aramco areas. All fenced areas. All assembly points. All restricted areas. None 24. If the receiver must leave the job site, the work permit can be left with: Anyone, as long as the permits remain on the job site. The receiver is not allowed to leave the job site under any circumstances. A senior crew member who understands the job and the conditions stated on the work permit. Anyone who can read the work permit. None 25. A work permit may be extended for one (1) additional operation shift, if: All hot work has been completed. The work is almost complete. The new on-coming issuer and receiver agree on conditions and sign the permit to extend it. Only cold work is being done. None 26. How is hot work permit different from cold work permit? Hot work identify potential source of ignition. Hot wok identify fuel source. Hot work identify the permit issuer. Hot work is red. None 27. Eliminate and Isolation are? PPE Administrative control All of above Engineering control None 28. Respiratory protection equipment authorized to be used in Saudi Aramco are; STBA/SCBA. SABA/SCBC STBA/SABA. SCBA/SABA None 29. Which of the following answers best describes a Work Permit Receiver? Craftsmen, or others, who have been certified to receive work permits. Only Saudi Aramco supervisors. Any maintenance or construction supervisor. All electrician, but not all welders. None 30. Toxic and flammable gases could be found in: Office buildings. Elevators. Excavations. Lakes or rivers. None 31. ho is the part of Joint Site inspection? Both. None of above. Work Permit Receiver. Work Permit Issuer. None 32. When can an electrician use a welder’s work permit? Never When they work on the same equipment at different times. If both the issuer and receiver agree and state so on the permit form. When the foreman gives his permission. None 33. In what order should hydrocarbon process equipment be prepared before welding the equipment? Isolate the equipment. Isolate, drain, purge, gas test. Gas test, isolate, drain content Clean, drain, gas test None 34. Heavy equipment operations are the most common cause of work related fatalities in Saudi Aramco. True False None 35. What should be the first step in controlling the hazards on the workplace? Wear PPEs Eliminate Reduce Isolate None 36. Filing of work permit Work permit should be kept in four months. Work permit should be kept in three months. Work permit should be kept in one month. Work permit should be kept in two months. None 37. A _________should be used for the erection of scaffolding. Hot Work permit. Cold Work permit. Release of Hazardous Liquids or Gases Work permit Confined Space Entry Work permit. None 38. Scaffold should not be erected near the excavation; it should be at least _ times the depth of the trench. 2 times 1.5 times 1.2 times None of above None 39. What are the primary hazards for excavations and trenching? Collapse and cave in Slip, trips and fall Oxygen enriched/deficient Toxic gases None 40. Orientation is part of the important aspects of Emergency Preparedness in Saudi Aramco that includes; Knowing the location of the mess hall/tea room Correct actions on hearing alarms Wearing your preferred dress Accessing the restricted offices None 41. Which of the following is not the example if unsafe act? Using defective equipment. Operating equipment without proper training or certification. Damaged/defective/incorrect equipment. Improper use of equipment. None 42. Who is jointly responsible for the safety of people and equipment at the work site? The issuer and receiver. Operations and maintenance engineer. The receiver and other workers at the job site. The issuer, receiver, gas tester and Loss Prevention representative None 43. When to stop and cancel a work permit? If the work has no barricade. Is the hazard is not in the work permit. If the receiver leave the site. If the work has no signage. None 44. What is a safety hazard? All of above. Electrical. Gravity. Mechanical. None 45. Wind direction must be considered when a permit is issued because: Items may be blown to the site making the work area untidy. Dust particles may be blown into opened lines or vessels. Flammable gases may be blown towards an ignition source. Because work must always take place downwind of the release. None 46. Hydrogen Sulfide (H2S) may react and explode when in contact with this Acid; Citric Acid Hydrochloric Acid Nitric Acid Muriatic Acid None 47. Restricted in Saudi Aramco are: Marine vessel/sewage treatment/plant/sump. Tank farm/plant pump station/warehouse. Air fueling operation/bulk plant/store room. Oil and gas plant/loading pier/office. None 48. This _________system is mandatory when responding to H2S emergencies or working in hazardous areas; GFCI. Buddy. LOTO. Sewage. None 49. What is NORM? Normally Occurring Radioactive material. Naturally Occurring Radioactive material. Neutrally Occurring Radioactive material. None of above. None 50. The purpose of hazard recognition is to __________hazards before they can cause an incident. Minimize Eliminate Identify Control None 1 out of 10 Please fill in the comment box below. Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Safety Officer Evaluation Online Exam next post work permit receiver saudi aramco questions and answers