1.
Wind direction must be considered when a permit is issued because:
2.
Where are work permits required?
3.
In what situation must lock and tag be installed?
4.
When can an electrician use a welder’s work permit?
5.
Any work that develops heat or provides an ignition source in a restricted area requires what type of work permit?
6.
A _________should be used for the erection of scaffolding.
7.
A ______________is a work permit process that helps identify, control, eliminate or minimize any hazards before work can begin, and then ensure that the area is safe when the work is complete.
9.
When must receiver stop the work?
10.
How to renew a work permit?
11.
This _________system is mandatory when responding to H2S emergencies or working in hazardous areas;
12.
ho is the part of Joint Site inspection?
13.
The purpose of hazard recognition is to __________hazards before they can cause an incident.
14.
Which of the following is not the example if unsafe act?
15.
What are the primary hazards for excavations and trenching?
16.
Why must the work permit issuer check the crane operator certificate before he issue work permit
17.
The confined Space Entry permit requires that:
18.
What are warning signs use for?
19.
What must be done when personnel working in the equipment could be injured by residual energy in the equipment?
20.
A work permit may be extended for one (1) additional operation shift, if:
21.
Who is jointly responsible for the safety of people and equipment at the work site?
22.
The receiver’s copy of the work permit which is currently in use should be:
23.
When working in noisy area what issuer will suggest.
24.
Ladders should extend at least _ ft. above the landing area?
25.
Orientation is part of the important aspects of Emergency Preparedness in Saudi Aramco that includes;
26.
If the receiver must leave the job site, the work permit can be left with:
27.
In Saudi Aramco, the maximum safe angle of the slope for type C soil is?
28.
What are the basic safety measures to protect the driver from fall when driving near the excavation?
29.
Filing of work permit
30.
What should be the first step in controlling the hazards on the workplace?
31.
Toxic and flammable gases could be found in:
32.
How is hot work permit different from cold work permit?
33.
Common Hazard in Saudi Aramco are slip, trips and falls, that are caused by:
34.
Restricted in Saudi Aramco are:
35.
What information the work permit issuer explain to the receiver before issuing EOLB permit?
36.
Hydrogen Sulfide (H2S) may react and explode when in contact with this Acid;
37.
Which of the following answers best describes a Work Permit Receiver?
38.
The duration for renewal of work permit is __.
39.
Who may approve critical lift plans?
40.
Respiratory protection equipment authorized to be used in Saudi Aramco are;
41.
Eliminate and Isolation are?
42.
What is a safety hazard?
43.
When to stop and cancel a work permit?
44.
A ____________is anything that can have an adverse impact on your safety.
45.
Heavy equipment operations are the most common cause of work related fatalities in Saudi Aramco.
46.
In what order should hydrocarbon process equipment be prepared before welding the equipment?
47.
Testing of H2S requires SCBA?
48.
What are ‘hold tags’ used for?
49.
Scaffold should not be erected near the excavation; it should be at least _ times the depth of the trench.
50.
The scaffold inspector must sign the tags for all scaffolds above 6m?
Leave a Comment