427 Welcome to your Saudi Aramco & Sabic Work Permit Receiver Question Answers let's get start Name Email 1. This _________system is mandatory when responding to H2S emergencies or working in hazardous areas; Buddy. LOTO. GFCI. Sewage. None 2. Respiratory protection equipment authorized to be used in Saudi Aramco are; SCBA/SABA SABA/SCBC STBA/SCBA. STBA/SABA. None 3. The confined Space Entry permit requires that: Only hot work can be done. Only cold work can be performed. Non-sparking tools be used. The confined space is properly isolated. None 4. Common Hazard in Saudi Aramco are slip, trips and falls, that are caused by: Uneven Floor Surfaces and and Changes in Level. Dry Floors and well-arranged cables Floors with flat surfaces Good Housekeeping None 5. In Saudi Aramco, the maximum safe angle of the slope for type C soil is? 34 (Type C) None of above 54 (Type A) 45 (Type B) None 6. A ______________is a work permit process that helps identify, control, eliminate or minimize any hazards before work can begin, and then ensure that the area is safe when the work is complete. Work Permit system Hazard Analysis Checklist Job Safety Analysis (JSA) Joint Site Inspection None 7. Testing of H2S requires SCBA? False True None 8. When to stop and cancel a work permit? Is the hazard is not in the work permit. If the work has no barricade. If the work has no signage. If the receiver leave the site. None 9. A ____________is anything that can have an adverse impact on your safety. Both health & safety Hazards Safety Hazard None of above Health Hazard None 10. How to renew a work permit? The issuer and receiver coming on shift sign for renewal The supervisor signed it The permit receiver sign for renewal The permit issuer sign for renewal None 11. When working in noisy area what issuer will suggest. Goggle. Gloves. Earmuff. None 12. Orientation is part of the important aspects of Emergency Preparedness in Saudi Aramco that includes; Wearing your preferred dress Knowing the location of the mess hall/tea room Correct actions on hearing alarms Accessing the restricted offices None 13. The receiver’s copy of the work permit which is currently in use should be: Kept with the Maintenance or Construction foreman. Posted or readily available at the job site. Kept at the Maintenance or Construction office. Posted in the control room. None 14. A _________should be used for the erection of scaffolding. Cold Work permit. Hot Work permit. Release of Hazardous Liquids or Gases Work permit Confined Space Entry Work permit. None 15. The duration for renewal of work permit is __. No renewal of permit. Three shifts. One shift. Two shifts. None 16. A work permit may be extended for one (1) additional operation shift, if: All hot work has been completed. The work is almost complete. Only cold work is being done. The new on-coming issuer and receiver agree on conditions and sign the permit to extend it. None 17. What are ‘hold tags’ used for? For hot work. To isolate electrical circuit breakers. To replace padlocks and lockout devices. To explain reasons for locking out equipment. None 18. Wind direction must be considered when a permit is issued because: Dust particles may be blown into opened lines or vessels. Flammable gases may be blown towards an ignition source. Because work must always take place downwind of the release. Items may be blown to the site making the work area untidy. None 19. What are warning signs use for? Identify restricted activities. Decoration. Identify restricted areas Identify hazard. None 20. Who is jointly responsible for the safety of people and equipment at the work site? The receiver and other workers at the job site. Operations and maintenance engineer. The issuer and receiver. The issuer, receiver, gas tester and Loss Prevention representative None 21. In what situation must lock and tag be installed? Before issuing work permit. All types of jobs. When the energy can cause injury. When instructed by the issuer. None 22. Why must the work permit issuer check the crane operator certificate before he issue work permit To prove he is competent To identify his company To make sure he own the equipment To check the equipment None 23. The scaffold inspector must sign the tags for all scaffolds above 6m? True False None 24. Ladders should extend at least _ ft. above the landing area? 4 2 3 5 None 25. In what order should hydrocarbon process equipment be prepared before welding the equipment? Isolate, drain, purge, gas test. Clean, drain, gas test Gas test, isolate, drain content Isolate the equipment. None 26. Which of the following answers best describes a Work Permit Receiver? Craftsmen, or others, who have been certified to receive work permits. Any maintenance or construction supervisor. Only Saudi Aramco supervisors. All electrician, but not all welders. None 27. When must receiver stop the work? Nobody can stop work. During inspection. During walkthrough. If stated in the duration box. None 28. Heavy equipment operations are the most common cause of work related fatalities in Saudi Aramco. False True None 29. Hydrogen Sulfide (H2S) may react and explode when in contact with this Acid; Citric Acid Nitric Acid Muriatic Acid Hydrochloric Acid None 30. Filing of work permit Work permit should be kept in four months. Work permit should be kept in three months. Work permit should be kept in two months. Work permit should be kept in one month. None 31. ho is the part of Joint Site inspection? Work Permit Receiver. Both. Work Permit Issuer. None of above. None 32. Any work that develops heat or provides an ignition source in a restricted area requires what type of work permit? Release Permit. Confined Space Entry. Cold Work. Hot Work. None 33. Who may approve critical lift plans? Rigger III Rigger II Rigger I Division Head None 34. Where are work permits required? All restricted areas. All Saudi Aramco areas. All fenced areas. All assembly points. None 35. What should be the first step in controlling the hazards on the workplace? Wear PPEs Isolate Eliminate Reduce None 36. Which of the following is not the example if unsafe act? Damaged/defective/incorrect equipment. Improper use of equipment. Operating equipment without proper training or certification. Using defective equipment. None 37. Eliminate and Isolation are? PPE Administrative control Engineering control All of above None 38. What is NORM? Neutrally Occurring Radioactive material. Naturally Occurring Radioactive material. None of above. Normally Occurring Radioactive material. None 39. The purpose of hazard recognition is to __________hazards before they can cause an incident. Minimize Eliminate Identify Control None 40. What are the basic safety measures to protect the driver from fall when driving near the excavation? Signage/standby man Standby man/barricade. Barricade/blinker light. Barricade/signage. None 41. What must be done when personnel working in the equipment could be injured by residual energy in the equipment? Isolate and apply lock and tag. Let him use PPE. Do not allow work. Issue work permit. None 42. If the receiver must leave the job site, the work permit can be left with: Anyone, as long as the permits remain on the job site. The receiver is not allowed to leave the job site under any circumstances. Anyone who can read the work permit. A senior crew member who understands the job and the conditions stated on the work permit. None 43. How is hot work permit different from cold work permit? Hot wok identify fuel source. Hot work is red. Hot work identify the permit issuer. Hot work identify potential source of ignition. None 44. What is a safety hazard? All of above. Mechanical. Gravity. Electrical. None 45. Toxic and flammable gases could be found in: Excavations. Elevators. Lakes or rivers. Office buildings. None 46. Restricted in Saudi Aramco are: Tank farm/plant pump station/warehouse. Oil and gas plant/loading pier/office. Air fueling operation/bulk plant/store room. Marine vessel/sewage treatment/plant/sump. None 47. When can an electrician use a welder’s work permit? Never When they work on the same equipment at different times. If both the issuer and receiver agree and state so on the permit form. When the foreman gives his permission. None 48. What information the work permit issuer explain to the receiver before issuing EOLB permit? Hazards of the chemical Responsible persons Duration of work permit Hazard of permitting. None 49. Scaffold should not be erected near the excavation; it should be at least _ times the depth of the trench. 1.2 times None of above 1.5 times 2 times None 50. What are the primary hazards for excavations and trenching? Collapse and cave in Toxic gases Slip, trips and fall Oxygen enriched/deficient None 1 out of 10 Please fill in the comment box below. Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Safety Officer Evaluation Online Exam next post work permit receiver saudi aramco questions and answers