236 Welcome to your Saudi Aramco & Sabic Work Permit Receiver Question Answers let's get start Name Email 1. The receiver’s copy of the work permit which is currently in use should be: Posted in the control room. Kept at the Maintenance or Construction office. Posted or readily available at the job site. Kept with the Maintenance or Construction foreman. None 2. In what order should hydrocarbon process equipment be prepared before welding the equipment? Isolate the equipment. Isolate, drain, purge, gas test. Gas test, isolate, drain content Clean, drain, gas test None 3. Scaffold should not be erected near the excavation; it should be at least _ times the depth of the trench. None of above 1.2 times 2 times 1.5 times None 4. What information the work permit issuer explain to the receiver before issuing EOLB permit? Responsible persons Duration of work permit Hazards of the chemical Hazard of permitting. None 5. Who may approve critical lift plans? Division Head Rigger II Rigger I Rigger III None 6. Eliminate and Isolation are? Engineering control Administrative control All of above PPE None 7. Which of the following is not the example if unsafe act? Using defective equipment. Improper use of equipment. Damaged/defective/incorrect equipment. Operating equipment without proper training or certification. None 8. This _________system is mandatory when responding to H2S emergencies or working in hazardous areas; Buddy. GFCI. LOTO. Sewage. None 9. Orientation is part of the important aspects of Emergency Preparedness in Saudi Aramco that includes; Wearing your preferred dress Accessing the restricted offices Knowing the location of the mess hall/tea room Correct actions on hearing alarms None 10. What are the basic safety measures to protect the driver from fall when driving near the excavation? Signage/standby man Standby man/barricade. Barricade/signage. Barricade/blinker light. None 11. Ladders should extend at least _ ft. above the landing area? 2 4 5 3 None 12. A ______________is a work permit process that helps identify, control, eliminate or minimize any hazards before work can begin, and then ensure that the area is safe when the work is complete. Work Permit system Joint Site Inspection Job Safety Analysis (JSA) Hazard Analysis Checklist None 13. Any work that develops heat or provides an ignition source in a restricted area requires what type of work permit? Confined Space Entry. Release Permit. Cold Work. Hot Work. None 14. Where are work permits required? All restricted areas. All fenced areas. All assembly points. All Saudi Aramco areas. None 15. Hydrogen Sulfide (H2S) may react and explode when in contact with this Acid; Nitric Acid Citric Acid Muriatic Acid Hydrochloric Acid None 16. In Saudi Aramco, the maximum safe angle of the slope for type C soil is? None of above 45 (Type B) 34 (Type C) 54 (Type A) None 17. Common Hazard in Saudi Aramco are slip, trips and falls, that are caused by: Dry Floors and well-arranged cables Uneven Floor Surfaces and and Changes in Level. Good Housekeeping Floors with flat surfaces None 18. Filing of work permit Work permit should be kept in three months. Work permit should be kept in one month. Work permit should be kept in two months. Work permit should be kept in four months. None 19. What are the primary hazards for excavations and trenching? Oxygen enriched/deficient Slip, trips and fall Collapse and cave in Toxic gases None 20. Toxic and flammable gases could be found in: Elevators. Office buildings. Excavations. Lakes or rivers. None 21. Which of the following answers best describes a Work Permit Receiver? Any maintenance or construction supervisor. Only Saudi Aramco supervisors. Craftsmen, or others, who have been certified to receive work permits. All electrician, but not all welders. None 22. When must receiver stop the work? During walkthrough. If stated in the duration box. During inspection. Nobody can stop work. None 23. Who is jointly responsible for the safety of people and equipment at the work site? The issuer, receiver, gas tester and Loss Prevention representative Operations and maintenance engineer. The issuer and receiver. The receiver and other workers at the job site. None 24. When to stop and cancel a work permit? If the work has no signage. Is the hazard is not in the work permit. If the work has no barricade. If the receiver leave the site. None 25. When working in noisy area what issuer will suggest. Goggle. Earmuff. Gloves. None 26. A work permit may be extended for one (1) additional operation shift, if: Only cold work is being done. The new on-coming issuer and receiver agree on conditions and sign the permit to extend it. The work is almost complete. All hot work has been completed. None 27. A ____________is anything that can have an adverse impact on your safety. None of above Both health & safety Hazards Health Hazard Safety Hazard None 28. Wind direction must be considered when a permit is issued because: Because work must always take place downwind of the release. Items may be blown to the site making the work area untidy. Dust particles may be blown into opened lines or vessels. Flammable gases may be blown towards an ignition source. None 29. What must be done when personnel working in the equipment could be injured by residual energy in the equipment? Isolate and apply lock and tag. Issue work permit. Let him use PPE. Do not allow work. None 30. Respiratory protection equipment authorized to be used in Saudi Aramco are; STBA/SCBA. STBA/SABA. SABA/SCBC SCBA/SABA None 31. Restricted in Saudi Aramco are: Marine vessel/sewage treatment/plant/sump. Tank farm/plant pump station/warehouse. Oil and gas plant/loading pier/office. Air fueling operation/bulk plant/store room. None 32. How to renew a work permit? The permit receiver sign for renewal The supervisor signed it The issuer and receiver coming on shift sign for renewal The permit issuer sign for renewal None 33. Why must the work permit issuer check the crane operator certificate before he issue work permit To prove he is competent To identify his company To make sure he own the equipment To check the equipment None 34. What are ‘hold tags’ used for? For hot work. To explain reasons for locking out equipment. To replace padlocks and lockout devices. To isolate electrical circuit breakers. None 35. When can an electrician use a welder’s work permit? When the foreman gives his permission. If both the issuer and receiver agree and state so on the permit form. When they work on the same equipment at different times. Never None 36. How is hot work permit different from cold work permit? Hot work identify potential source of ignition. Hot work is red. Hot work identify the permit issuer. Hot wok identify fuel source. None 37. The confined Space Entry permit requires that: Non-sparking tools be used. The confined space is properly isolated. Only cold work can be performed. Only hot work can be done. None 38. ho is the part of Joint Site inspection? Work Permit Receiver. Both. None of above. Work Permit Issuer. None 39. What should be the first step in controlling the hazards on the workplace? Wear PPEs Isolate Eliminate Reduce None 40. In what situation must lock and tag be installed? When the energy can cause injury. All types of jobs. When instructed by the issuer. Before issuing work permit. None 41. A _________should be used for the erection of scaffolding. Hot Work permit. Confined Space Entry Work permit. Release of Hazardous Liquids or Gases Work permit Cold Work permit. None 42. The duration for renewal of work permit is __. No renewal of permit. Three shifts. One shift. Two shifts. None 43. Heavy equipment operations are the most common cause of work related fatalities in Saudi Aramco. True False None 44. What are warning signs use for? Identify restricted areas Decoration. Identify restricted activities. Identify hazard. None 45. The scaffold inspector must sign the tags for all scaffolds above 6m? False True None 46. The purpose of hazard recognition is to __________hazards before they can cause an incident. Identify Eliminate Minimize Control None 47. If the receiver must leave the job site, the work permit can be left with: A senior crew member who understands the job and the conditions stated on the work permit. Anyone who can read the work permit. The receiver is not allowed to leave the job site under any circumstances. Anyone, as long as the permits remain on the job site. None 48. What is NORM? None of above. Normally Occurring Radioactive material. Neutrally Occurring Radioactive material. Naturally Occurring Radioactive material. None 49. Testing of H2S requires SCBA? False True None 50. What is a safety hazard? Gravity. All of above. Mechanical. Electrical. None 1 out of 10 Please fill in the comment box below. Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Safety Officer Evaluation Online Exam next post work permit receiver saudi aramco questions and answers