229 Welcome to your Saudi Aramco Safety Officer Evaluation Online Exam let's get start Name Email 1. Spray Painting requires? A correct air purifying respirator No wind A good spray Work only in spray painting shop None 2. During storage of oxygen and acetylene gas cylinders they must be separated by (1) A fire Resistant wall or (2) a Distance of______: Not required if tanks are empty None of the above 50 feet 20 feet None 3. A straight or extension ladder must extend over the edge of a roof, excavation, or scaffold platform by minimum distance: 0.9 meter 4 feet No ser distance 1 foot None 4. Light duty scaffold designed and constructed to carry the: weight of personnel only Uniformly distributed maximum intended load is 120 kg/m2 (1.2 kN/m2) (25 lb/ft2). All of the above no material storage other than the weight of tools None 5. How long is a work permit usually valid 1 Week 1 Day 1 Shift 1 Month None 6. What is the first thing you should do if a person falls in the water? Inform the Captain/Maser. Throw a floatation device in the water Follow the directions of the Captain/Master Shout “Man Overboard” None 7. If someone is injured on your job site, a preliminary written report must be submitted to the Saudi Aramco PMT within ________ period of time and final report within _________: 2 hours, 48 hours 1 hour, 48 hours 24 hours, 72 hours 8 hours, 72 hours None 8. What is the permissible noise exposure for an eight hours work shift? 120 100 80 90 None 9. Which is the correct procedure to de-energize an electric circuit? Lock, tag, clear and try None of the above Lock, tag, try and clear Tag, lock, clear and try None 10. When checking the ground on a duplex outlet, which of the following provides the best method? Check the continuity between green wire and the outlet box Check the continuity between the block and the white wire Check the continuity between green wire and the building ground Check the continuity between white wire and the outlet box None 11. Where is a work permit required? All Saudi Aramco Areas In areas designated by the department manager as requiring a work permit None of the above Construction work shop None 12. What is the purpose of a hold tag? All of above To isolate or de-energized equipment To work the job safely To explain the reason why the equipment is being locked out None 13. How should you stand on a moving personnel basket? Stand straight, both feet on the basket rim, hold with both hands Lean forward, both feet on the basket rim, hold with both hands Lean backward, both feet on the basket rim, hold with both hands. Stand straight, one foot on the basket rim, hold with both hands. None 14. Flammable materials storage areas cannot be located within________ of other buildings or Structures: 50 ft 25 ft 50 meters 100 ft None 15. The Saudi Aramco General Instruction which sets forth the Work Permit Receiver’s requirement is: GI 5.430 GI 6.200 GI 1.200 GI 2.100 None 16. If someone is injured on your job site, a preliminary written report must submitted to the Saudi Aramco PMT within _________ period of time: 8 Hours 3 Days 24 Hours 2 Hours None 17. What is the grade of the supplied air for hood and respirators during abrasive blasting? A B C D None 18. When there is opening in roof work and/or edges of roof, and a fall hazard exist, barricades must be installed capable of withstand a force of: 200 lbs (91kg) 150 lbs (68kg) 125 lbs (56.7kg) 100 lbs (54.4kg) None 19. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12” wide False True None 20. A design of straps that may be secured about a person in a manner to distribute the fall arrest forces over the thighs, pelvis, waist, chest and shoulders, with means for attaching the harness to other components of a personal fall arrest system is called: Positioning Device full Body Harness Layard Body Belt None 21. Personnel performing work at heights and their supervisors shall: Be trained in the nature of fall hazards in the work area and Undergo refresher training at least every 3 years Demonstrate competency by successfully passing written and practical tests. All of the above None 22. The ratio of vertical to horizontal spacing for a straight or extension ladder is: 2 to 1 4 to 1 1 to 1 3 to 1 None 23. What is necessary for a worker to wear on a steel beam six feet of more above ground? A steel belt with steel or brass coupling A full body harness with lanyards attached to an anchor point He must never go on steel beam None of the above None 24. Moving machine parts shall be ________ if located 2.5m(8.2ft) or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. Eliminated Guarded Separated Removed None 25. The maximum working pressure on an acetylene gauge is _____ PSI: 15 7 8 19.50 None 26. Mobile scaffold shall have a maximum height of: 4 times its smallest base width 4 times its biggest base width 3 times its biggest base width 3 times its smallest base width None of the above None 27. Personnel basket shall not be permitted to transfer personnel when the wind speed exceeds _______ or in rough weather 25 km/h (14 knots) 13 km/s (7 knots) 28 km/h (21 knots) 50 km/h (28 knots) None 28. How many clips are required to construct an eye in a one half inch wire rope? 4 clips with U bolts on the dead end 3 clips with U bolts on the live end 4 clips with U bolts on the live end 3 clips with U bolt on the dead end None 29. Reverse alarms shall be minimum_____ audible and working on all heavy equipment. 10 decibels (dBA). 85 decibels (dBA). 30 decibels (dBA). 20 decibels (dBA). None 30. Minimum period of time the appointed “fire watch” remain at the site of HOT work after the activity has stopped 10 minutes 60 minutes 15 minutes 30 minutes None 31. The maximum working pressure on an acetylene gauge is ________ psig. 15 10 20 7 None 32. which of the statement is correct, “Select all that apply:” A special scaffold is: Formwork shoring constructed of scaffolding materials and supporting an elevated concrete slab/deck more than 100 mm (4 inches) thick Over 42 metres Scaffold supported by or hung from wind girders or roof / floating roof tanks Cantilevered scaffold by more than 3 meters (10 feet) None 33. Forklifts shall not be left unattended with the engine running. When forklifts are parked the forks shall not be in a raised position. True False None 34. The maximum voltage permitted for portable power tool in construction site is: 220 Volt 240 Volt 110 Volt 150 Volt None 35. Work platforms must have toe boards, top rails and access ladders once they reach a height of_____: When the height is four times greater than the base width 6 ft 8 ft 4 ft None 36. Contractor shall provide one (1) safety Supervisor for: Every area regardless the number of safety Officer Every 5 safety Officer Every 8 safety Officer Every 10 safety Officer None 37. Flammable materials storage area cannot be located within_________ of other buildings or structure. 100 ft 50 ft 25 ft 50 Meters None 38. Who is allowed to perform abrasive blasting? All Saudi Aramco employees and Contractor Contractor abrasive blasters All Saudi Aramco employees and Contractor with 3rd party certification All Saudi Aramco certified employees and Contractor None 39. Forklifts shall be equipped with, “Select all that apply:” A fire extinguisher Overhead protection All of the above A backup warning alarm Seatbelts None 40. The soil type that is least stable in an excavation is: Type B Type A None of the above Type C None 41. When can you transfer from a boat to a boat landing (or vice versa) using the swing rope technique? When the winds are light. If you have both hand free. During an emergency drill. After you have received the training. None 42. Hold tags and locks are primary intended to protect the individual who is doing the work from? Being injured in case of accident start up Leaving until the work is completed Sleeping Being thrown in jail None 43. Moving machinery parts shall be guarded if located ________or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. 1.8 (6ft) 2.5 m (8.2 ft) 2m 1.5m None 44. When grinding a piece of metal with a portable power grinder, the type of Personal Protective Equipment required is: Safety glass only Goggles only Safety glasses/face shield combination Face shield only None 45. A person allowed to operate crane in S.A project, “Select all that apply:” Crane maintenance personnel and inspector in the performance of duties SAG licensed personnel. Trainees Under the direct supervision of qualified trainer S.A. certified crane operator None 46. Forks shall be tilted back and raised no more than______ above the ground to maintain stability when traveling with loads. 15-30 cm (6-12 inches) 10-20 cm (4-8 inches) not required. 15-20 cm (6-8 inches) None 47. A crane is working near 2 meter deep excavation, minimum distance from the edge shall be: 2 Meter 1 Meter None of the above 3 Meter None 48. Which of the following factors does affect the load capacity of a mobile crane? Boom length Installation of an anti-two block device Boom angle Extending the out rigger fully None 49. How is transfer from boat to boat landing done safety? Grab the knotted rope when the boat is in BETWEEN swells, swing to the platform; PUSH off the boat with your feet. Grab the knotted rope when the boat is on top of the swell; swing to the platform using GRAVITY to pull you to the landing. Grab the knotted rope when the boat is at the TOP of a swell; swing to the platform; PUSH off with your feet Grab the knotted rope when the boat is at the BOTTOM of a swell; swing to the platform; PUSH off the boat with your feet None 50. Whenever there is any doubt as to safety of the lift, the crane operator shall: Refuse to handle unsafe loads a and b only Stop all hoisting activities. Discuss the matter with the signal man None 1 out of 5 Please fill in the comment box below. Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Permit Receiver Latest Questions and Answers next post Saudi Aramco & Sabic Work Permit Receiver Question Answers