321 Welcome to your Saudi Aramco Safety Officer Evaluation Online Exam let's get start Name Email 1. Minimum period of time the appointed “fire watch” remain at the site of HOT work after the activity has stopped 10 minutes 60 minutes 30 minutes 15 minutes None 2. The maximum working pressure on an acetylene gauge is _____ PSI: 8 7 15 19.50 None 3. Spray Painting requires? A correct air purifying respirator No wind Work only in spray painting shop A good spray None 4. A straight or extension ladder must extend over the edge of a roof, excavation, or scaffold platform by minimum distance: No ser distance 4 feet 1 foot 0.9 meter None 5. How is transfer from boat to boat landing done safety? Grab the knotted rope when the boat is on top of the swell; swing to the platform using GRAVITY to pull you to the landing. Grab the knotted rope when the boat is at the TOP of a swell; swing to the platform; PUSH off with your feet Grab the knotted rope when the boat is at the BOTTOM of a swell; swing to the platform; PUSH off the boat with your feet Grab the knotted rope when the boat is in BETWEEN swells, swing to the platform; PUSH off the boat with your feet. None 6. Which of the following factors does affect the load capacity of a mobile crane? Boom length Installation of an anti-two block device Extending the out rigger fully Boom angle None 7. How long is a work permit usually valid 1 Shift 1 Month 1 Day 1 Week None 8. A design of straps that may be secured about a person in a manner to distribute the fall arrest forces over the thighs, pelvis, waist, chest and shoulders, with means for attaching the harness to other components of a personal fall arrest system is called: full Body Harness Body Belt Layard Positioning Device None 9. Moving machinery parts shall be guarded if located ________or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. 2.5 m (8.2 ft) 1.8 (6ft) 2m 1.5m None 10. Mobile scaffold shall have a maximum height of: 4 times its biggest base width 4 times its smallest base width None of the above 3 times its biggest base width 3 times its smallest base width None 11. Hold tags and locks are primary intended to protect the individual who is doing the work from? Sleeping Being injured in case of accident start up Leaving until the work is completed Being thrown in jail None 12. A crane is working near 2 meter deep excavation, minimum distance from the edge shall be: 1 Meter None of the above 2 Meter 3 Meter None 13. When there is opening in roof work and/or edges of roof, and a fall hazard exist, barricades must be installed capable of withstand a force of: 150 lbs (68kg) 125 lbs (56.7kg) 100 lbs (54.4kg) 200 lbs (91kg) None 14. What is necessary for a worker to wear on a steel beam six feet of more above ground? A steel belt with steel or brass coupling None of the above A full body harness with lanyards attached to an anchor point He must never go on steel beam None 15. What is the purpose of a hold tag? All of above To isolate or de-energized equipment To work the job safely To explain the reason why the equipment is being locked out None 16. Forklifts shall not be left unattended with the engine running. When forklifts are parked the forks shall not be in a raised position. False True None 17. Work platforms must have toe boards, top rails and access ladders once they reach a height of_____: When the height is four times greater than the base width 8 ft 4 ft 6 ft None 18. How many clips are required to construct an eye in a one half inch wire rope? 3 clips with U bolts on the live end 4 clips with U bolts on the live end 4 clips with U bolts on the dead end 3 clips with U bolt on the dead end None 19. Contractor shall provide one (1) safety Supervisor for: Every 10 safety Officer Every 5 safety Officer Every area regardless the number of safety Officer Every 8 safety Officer None 20. How should you stand on a moving personnel basket? Lean backward, both feet on the basket rim, hold with both hands. Stand straight, one foot on the basket rim, hold with both hands. Lean forward, both feet on the basket rim, hold with both hands Stand straight, both feet on the basket rim, hold with both hands None 21. Reverse alarms shall be minimum_____ audible and working on all heavy equipment. 85 decibels (dBA). 30 decibels (dBA). 20 decibels (dBA). 10 decibels (dBA). None 22. The maximum voltage permitted for portable power tool in construction site is: 220 Volt 110 Volt 150 Volt 240 Volt None 23. When grinding a piece of metal with a portable power grinder, the type of Personal Protective Equipment required is: Goggles only Safety glasses/face shield combination Face shield only Safety glass only None 24. If someone is injured on your job site, a preliminary written report must be submitted to the Saudi Aramco PMT within ________ period of time and final report within _________: 24 hours, 72 hours 8 hours, 72 hours 1 hour, 48 hours 2 hours, 48 hours None 25. When checking the ground on a duplex outlet, which of the following provides the best method? Check the continuity between white wire and the outlet box Check the continuity between the block and the white wire Check the continuity between green wire and the outlet box Check the continuity between green wire and the building ground None 26. Personnel basket shall not be permitted to transfer personnel when the wind speed exceeds _______ or in rough weather 50 km/h (28 knots) 25 km/h (14 knots) 28 km/h (21 knots) 13 km/s (7 knots) None 27. The soil type that is least stable in an excavation is: Type C None of the above Type B Type A None 28. The ratio of vertical to horizontal spacing for a straight or extension ladder is: 3 to 1 1 to 1 4 to 1 2 to 1 None 29. Forklifts shall be equipped with, “Select all that apply:” All of the above Overhead protection A backup warning alarm Seatbelts A fire extinguisher None 30. The maximum working pressure on an acetylene gauge is ________ psig. 15 20 7 10 None 31. Which is the correct procedure to de-energize an electric circuit? None of the above Lock, tag, try and clear Lock, tag, clear and try Tag, lock, clear and try None 32. Who is allowed to perform abrasive blasting? All Saudi Aramco certified employees and Contractor Contractor abrasive blasters All Saudi Aramco employees and Contractor All Saudi Aramco employees and Contractor with 3rd party certification None 33. Flammable materials storage areas cannot be located within________ of other buildings or Structures: 100 ft 25 ft 50 meters 50 ft None 34. Moving machine parts shall be ________ if located 2.5m(8.2ft) or less above the floor or working surface. This includes flywheels, shafts, pulleys and belt/chain drives. Separated Eliminated Guarded Removed None 35. What is the first thing you should do if a person falls in the water? Throw a floatation device in the water Shout “Man Overboard” Follow the directions of the Captain/Master Inform the Captain/Maser. None 36. Forks shall be tilted back and raised no more than______ above the ground to maintain stability when traveling with loads. 10-20 cm (4-8 inches) 15-20 cm (6-8 inches) 15-30 cm (6-12 inches) not required. None 37. When can you transfer from a boat to a boat landing (or vice versa) using the swing rope technique? After you have received the training. During an emergency drill. If you have both hand free. When the winds are light. None 38. If someone is injured on your job site, a preliminary written report must submitted to the Saudi Aramco PMT within _________ period of time: 24 Hours 2 Hours 3 Days 8 Hours None 39. A person allowed to operate crane in S.A project, “Select all that apply:” Crane maintenance personnel and inspector in the performance of duties SAG licensed personnel. Trainees Under the direct supervision of qualified trainer S.A. certified crane operator None 40. During storage of oxygen and acetylene gas cylinders they must be separated by (1) A fire Resistant wall or (2) a Distance of______: Not required if tanks are empty 50 feet None of the above 20 feet None 41. What is the permissible noise exposure for an eight hours work shift? 80 90 120 100 None 42. What is the grade of the supplied air for hood and respirators during abrasive blasting? B C D A None 43. Personnel performing work at heights and their supervisors shall: Demonstrate competency by successfully passing written and practical tests. All of the above Be trained in the nature of fall hazards in the work area and Undergo refresher training at least every 3 years None 44. Whenever there is any doubt as to safety of the lift, the crane operator shall: Stop all hoisting activities. a and b only Discuss the matter with the signal man Refuse to handle unsafe loads None 45. Light duty scaffold designed and constructed to carry the: weight of personnel only Uniformly distributed maximum intended load is 120 kg/m2 (1.2 kN/m2) (25 lb/ft2). All of the above no material storage other than the weight of tools None 46. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12” wide False True None 47. The Saudi Aramco General Instruction which sets forth the Work Permit Receiver’s requirement is: GI 1.200 GI 2.100 GI 6.200 GI 5.430 None 48. Flammable materials storage area cannot be located within_________ of other buildings or structure. 25 ft 50 ft 50 Meters 100 ft None 49. which of the statement is correct, “Select all that apply:” A special scaffold is: Cantilevered scaffold by more than 3 meters (10 feet) Scaffold supported by or hung from wind girders or roof / floating roof tanks Formwork shoring constructed of scaffolding materials and supporting an elevated concrete slab/deck more than 100 mm (4 inches) thick Over 42 metres None 50. Where is a work permit required? Construction work shop None of the above In areas designated by the department manager as requiring a work permit All Saudi Aramco Areas None 1 out of 5 Please fill in the comment box below. Share 0 FacebookTwitterPinterestLinkedinRedditWhatsappTelegramEmail previous post Saudi Aramco Permit Receiver Latest Questions and Answers next post Saudi Aramco & Sabic Work Permit Receiver Question Answers